ClockSunday, 24/01/2021 15:15

Gathering ideas on an overall conservation and restoration plan of Thai Hoa Palace monument

HNN.VN - On January 23, Hue Monuments Conservation Center held a conference to gather ideas on an overall conservation and restoration plan of Thai Hoa Palace monument, with the participation of researchers and experts in the field of conservation.

Technology at handProfessor Michael Patrick Dunne and “predestined love” with Hue

Researchers and experts commented on the restoration of Thai Hoa Palace

According to the plan of restoring, repairing and embellishing Thai Hoa Palace, Hue Monuments Conservation Center will demolish all of the roofs, restore the lower and upper roofs; demolish the entire frame system and wood structures so as to assess the quality of each structure and propose a detailed restoration and repair plan; and restore the painting for all of the wooden structures, etc.

For the systems of road yard and handrail, they will dismantle and reinforce the sloping wall sections, reinforce the foundation structure with reinforced concrete; dismantle the damaged handrail sections, and recover them with brick and TH mortar; dismantle the entire Bat Trang brick-paved road yard, restore the Bat Trang brick-paved floor, and curb the pavement with bricks according to its origin, etc.

The conference received many comments from researchers and experts. Some comments note that Hue Monuments Conservation Center needs to access additional resources, including original images, and restoration drawings under the reign of Emperor Khai Dinh, as well as knowledgeable witnesses about this monument, so that the restoration will ensure the authenticity. It is necessary to have a plan to renovate the decorative arts of Thai Hoa Palace, especially the poetic system on the wood and Phap lam paintings; pay attention to the embellishment of the landscape associated with this monument; and refer to the international conventions when restoring world heritages, etc.

Thai Hoa Palace, which was built in 1805, is one of the typical buildings of Hue imperial architecture, with the form of "trùng thiềm điệp ốc" (“two sets of roofs on one platform”). The monument, which has been existed for a long time and undergone through 22 restoration times, is now seriously degraded, especially after the storms and floods in 2020. The Government has currently allocated a capital of VND 100 billion to restore and repair the monument urgently.

Story and photo: Minh Hien

RATING
Be the first to review this post!
  Comment

YOU MAY CARE ABOUT

Dismantling of the Quoc Tu Giam heritage site

The Quoc Tu Giam heritage site is currently being dismantled as part of a large-scale conservation and restoration project with a total budget of more than 108 billion VND.

Dismantling of the Quoc Tu Giam heritage site
Timely Review and Update of the 2026 Plan for Disaster Prevention and Control

On the evening of April 1, Prime Minister and Head of the National Civil Defense Steering Committee Pham Minh Chinh, together with President of the Central Committee of Vietnam Fatherland Front Bui Thi Minh Hoai, co-chaired a nationwide conference, held both in-person and online, on disaster prevention and control for 2026.

Timely Review and Update of the 2026 Plan for Disaster Prevention and Control
Foundation reinforcement prior to Dien Can Chanh restoration

After nearly 80 years during which only its foundational vestiges survived, Dien Can Chanh (Palace of Diligent Governance) - the central venue for major political activities of the Nguyen Dynasty - is being prepared for restoration on a rigorous scientific basis.

Foundation reinforcement prior to Dien Can Chanh restoration
Promoting the role of community in sustainable biodiversity conservation

On January 30, the Department of Agriculture and Environment, in coordination with the Agriculture and Environment Newspaper and the World Wide Fund for Nature (WWF-Vietnam), organized the “Media Forum on Mobilizing Community and Stakeholders to the Work of Sustainable Biodiversity Conservation” under the framework of MiB-GBF Project.

Promoting the role of community in sustainable biodiversity conservation

LASTEST NEWS

Return to top