ClockSaturday, 21/09/2024 17:47

Investment planned for pedestrian and bicycle bridge project over An Cuu river

HNN.VN - Hue City People's Council has agreed to add the construction project for a pedestrian and bicycle bridge over An Cuu River (a Y-shaped bridge) to the overall adjusted medium-term public investment plan for 2021-2025.

Acceleration on Perfume River-crossing bridge construction siteEstablishing and developing a certification mark for the tourism destination "Thanh Toan tiled-roof bridge village market"From the design dossier of Truong Tien Bridge: Thinking about the repatriation of antiquities

 Colored perspective of the new Y-bridge

According to the plan, the project will be supported by provincial budget funds and implemented over three years with a total investment of more than 29 billion VND. The proposed location for the Y-shaped bridge is at the intersection of the Perfume River and An Cuu River, with one side connected to the area near the park and Perfume River Theater, and the other side to Da Vien Islet, which has recently been renovated.

The Y-shaped bridge is designed for both pedestrian and bicycle traffic, with a width of 4.2 meters and a length of 47.4 meters. The bridge will feature a steel lattice floor structure, with its surface paved in ironwood; and, the banisters using bronze railings, creating a unique experience for tourists walking along the Perfume River. It will also allow boats to pass beneath easily. The bridge will include resting spots where visitors can take a break and enjoy the view or take photos. The slope of the bridge will be designed to accommodate easy access for both cyclists and people with disabilities.

In addition to being a new highlight for the scenic area along both sides of the An Cuu River, the Y-shaped bridge will connect the walking route on the southern side of the Perfume River from the Perfume River Theater to Bui Thi Xuan Park, making it easier for residents to walk or cycle.

By THANH HUONG
RATING
Be the first to review this post!
  Comment

YOU MAY CARE ABOUT

New Appeal from Industrial and Economic Zones

The synchronous investment in infrastructure across economic and industrial zones is opening a new development space for Hue, while also enhancing its capacity to attract large-scale projects, and creating a ripple effect for the growth of supporting industries, logistics services, and import-export activities.

New Appeal from Industrial and Economic Zones
Ensuring progress of schools in border areas

On March 6th, Mr. Nguyen Thanh Binh, Member of the Standing Committee of the City Party Committee and Standing Vice Chairman of Hue City People’s Committee, together with representatives of several relevant departments and agencies, held a working session and inspected the progress of investment and construction of boarding inter-level schools (primary and lower secondary) in A Luoi 3 and A Luoi 4 communes.

Ensuring progress of schools in border areas
Nearly 125 billion VND invested in the reconstruction of Thanh Ha Bridge

On the afternoon of March 2, Hue City Department of Construction announced that the Chairman of the City People's Committee has approved the investment policy for the reconstruction of Thanh Ha Bridge (Km 7+810, Provincial Road 4), in Hoa Chau Ward, with a total investment of nearly 125 billion VND.

Nearly 125 billion VND invested in the reconstruction of Thanh Ha Bridge

LASTEST NEWS

Return to top